{{title}}
{{#is_paid}} Premium {{/is_paid}}{{short_description}}
{{DateTime}} IST {{#location}} | {{location}} {{/location}} {{#authors.author1_name}} | {{authors.author1_name}} {{/authors.author1_name}} {{#authors.author2_name}} | {{authors.author2_name}} {{/authors.author2_name}}{{title}}
{{#is_paid}} Premium {{/is_paid}}{{short_description}}
{{DateTime}} IST {{#location}} | {{location}} {{/location}} {{#authors.author1_name}} | {{authors.author1_name}} {{/authors.author1_name}} {{#authors.author2_name}} | {{authors.author2_name}} {{/authors.author2_name}}Mumbai Metro Aqua Line timings restricted on Holi 2025, check details
Mumbai Metro line will be operational from 8:30 am to 10:30 pm instead of its usual timings
13 March,2025 11:21 PM IST | Mumbai | Rajendra B. AklekarAI to track trespassers on Pune Metro tracks, enhance safety
Maha Metro rolls out AI-powered surveillance to prevent suicides, protests, and security breaches
11 March,2025 08:42 AM IST | Mumbai | Archana Dahiwal'Maharashtra will be number one in fulfilling PM Modi's Viksit Bharat dream'
The Finance Minister also said that 56 companies signing MoUs at Davos will bring in investments worth Rs 15.72 lakh crore and generate 16 lakh jobs
10 March,2025 04:35 PM IST | Mumbai | mid-day online correspondentMaharashtra Budget: Mumbai Metro to link CSMIA-Navi Mumbai airport, says Pawar
Ajit Pawar said that the highways, ports, airports, waterways, bus transport, railways and metros are all priority areas getting adequate budgetary support
10 March,2025 04:31 PM IST | Mumbai | mid-day online correspondentLet there be light! MMRDA finally pays Rs 8 lakh bill for Naigaon ROB
Hours after our report highlighting the bridge that was shrouded in darkness for a fortnight, MMRDA finally clears dues
09 March,2025 07:40 AM IST | Mumbai | Diwakar SharmaMira-Bhayander gets state-of-the-art double-decker flyover
The double-decker flyover, which is part of Metro Line-9, stretches from Sai Baba Nagar Metro Station near the SK Stone Junction to Shivar Garden in Mira Road
08 March,2025 08:40 PM IST | Mumbai | mid-day online correspondentMumbai Metro 1 to run additional services between Andheri and Ghatkopar
Move is the first innovation on 10-year-old line, and is expected to help the dense crush between the two stations
08 March,2025 07:19 AM IST | Mumbai | Rajendra B. AklekarNaigaon’s only East-West link goes dark over unpaid power bill
Electricity supplier alleges that the agency in charge of the bridge has not paid R8.36 lakh in power bill dues; citizens and cops fume
08 March,2025 07:12 AM IST | Mumbai | Diwakar SharmaMumbai Metro tweaks operations with a shorter loop between Andheri and Ghatkopar
Mumbai Metro Blue Line 1 has introduced a shorter turnaround between Andheri and Ghatkopar to ease congestion and improve frequency. The experiment, based on passenger feedback, is being closely monitored.
07 March,2025 12:34 PM IST | Mumbai | Rajendra B. AklekarGhatkopar station upgrade on track, piling work to finish by March-end
Debris removed and barricades minimised, following this paper’s report highlighting the commuter crush because of ongoing work. “Crowding for the Metro at Ghatkopar station often gets out of hand. On Thursday, the crowd occupied the entire foot overbridge, leaving no space for commuters. The station needs better connectivity
07 March,2025 12:02 PM IST | Mumbai | Rajendra B. Aklekar