Lok Everest Complex residents say names were mentioned under wrong ward; BMC says citizens were given ample time to correct information in voter list
10 January,2026 01:28 PM IST | Mumbai | Eeshanpriya MSLocals complain about power and gas cuts, air pollution from dust, and significant traffic congestion; say will recall these issues during voting
07 January,2026 08:36 AM IST | Mumbai | Aditi AlurkarLBS Road footpath, widest at 2 feet, reduces to 30 cm at some locations; getting worse at the Vikhroli road overbridge (ROB) junction, the footpath is barely walkable as at every 10 meters
29 November,2025 08:14 AM IST | Mumbai | Madhulika Ram KavatturThe total length of Mumbai Metro Line 4 stands at approx. 35.2 km with 32 metro stations and 8-car fully automated metro trains will run on the route connecting Thane and Mumbai
03 November,2025 08:33 PM IST | Mumbai | mid-day online correspondentADVERTISEMENT