shot-button
Maharashtra Elections 2024 Maharashtra Elections 2024
Home > Mumbai > Mumbai News > Article > Maharaja will be first to land at T2 terminal

Maharaja will be first to land at T2 terminal

Updated on: 11 February,2014 08:10 AM IST  | 
MiDDAY team |

Scheduled to arrive at 1 pm tomorrow, Air India’s flight from Singapore will be first to touch down at the new integrated T2 complex; Jet Airways will be first to fly out

Maharaja will be first to land at T2 terminal

How it works
>> Passengers booked on international flights departing before 1 pm will have to board their flights from old international terminal 


>> Passengers flying after 1 pm will board flights from T2




Illustration: Amit Bandre


>> Flights landing before 12 noon will land at old terminal while aircraft scheduled to arrive after midday will touch down at T2

>> In order to eliminate confusion, old terminal will be closed for operations from 2 pm onwards and roads leading to the terminal will be barricaded

CM to inaugurate Sahar Elevated road
The Sahar Elevated Road will be thrown open to traffic tomorrow. Chief Minister Prithviraj Chavan will inaugurate the six-lane approach road that has four entry and two exit points. The length of the proposed road is 2 km, and the cost of the project is Rs 287.37 crore.

This road has been funded under the Jawaharlal Nehru National Urban Renewal Mission. MMRDA Joint Project Director Dilip Kawatkar said, “The decision to allow two-wheelers on the elevated road will be taken by the traffic department.”

Access to T2

>> All international passengers making their way on four-wheelers and private buses to CSIA will be allowed access to T2’s departure zone at Level-4 through the Sahar Elevated Road that connects the Western Express Highway with CSIA

>> No entry for three-wheelers and two-wheelers on the newly constructed elevated road. They, including BEST buses, will have to use the existing road to access the T2 building

>> GVK and MIAL employees will occupy positions at all entry points to guide passengers to the entrance gates for departure and arrivals

>> In case any passenger turns up at the old terminal, GVK staff has made arrangements to transport them to T2
>> Of the 21,000 sq-m retail space made available for retailers inside, T2 will only see a handful of counters open, as it will take a minimum two months for all the shops to open

>> In order to ensure everything goes according to plan on the first day and thereafter, GVK has conducted 46 trials and 40 operational trials capable of handling with 1,700 passengers with the help of 600 staffers in the last seven months.

For your convenience
The new integrated Terminal 2 consists of four levels:

>> Level 1 comprises ground services, ground transportation lobby, arrival bus gate, lounges and baggage handling systems.

>> Level 2 comprises arrivals corridor, arrivals duty free, customs & immigration, baggage reclaim and arrivals forecourt.

>> Level 3 comprises security for domestic passengers, domestic departures retail, F&B and the domestic departure gates.

>> Level 4 comprises common check-in facilities, international security & immigration, international departures retail, duty free, F&B. International departure gates are located on this level

"Exciting news! Mid-day is now on WhatsApp Channels Subscribe today by clicking the link and stay updated with the latest news!" Click here!


Mid-Day Web Stories

Mid-Day Web Stories

This website uses cookie or similar technologies, to enhance your browsing experience and provide personalised recommendations. By continuing to use our website, you agree to our Privacy Policy and Cookie Policy. OK