10 October,2022 10:28 PM IST | Mumbai | PTI
Representational Pic
The movement of traffic at Chandni Chowk in Pune will be stopped between 12:30 am and 1 am from Wednesday till further orders to facilitate the blasting of rocks as part of construction of a multi-level flyover at the congested junction, officials said on Saturday.
An old bridge was demolished through a controlled blast last week at the junction, situated on the Mumbai-Bengaluru highway, as part of ambitious efforts to create new infrastructure to mitigate traffic bottlenecks there.
Also Read: Maharashtra reports 3,585 swine flu deaths since January
To complete these works, including creation of service roads, blasting of rocks on both sides of the arterial route is required for which traffic movement will be halted between 12:30 am and 1 am every day from October 12, a National Highway Authority of India (NHAI) official said.
ALSO READ
Car crashes into jersey barrier on Mumbai-Ahmedabad highway; 6 escape unhurt
Maha Yagnam on 80 years of Sri Subramania Samaj forming
Mumbai: Pay attention to 5-km radius in bad AQI areas, says BMC chief
President Murmu greets citizens on eve of Christmas
Senior IAS officer Harshdeep Kamble takes over as GM of BEST
Anand Bhoite, Pimpri Chinchwad Deputy Commissioner of Police (Traffic) said the 30-minute block was to start from Tuesday but had to be postponed due to rains.
This story has been sourced from a third party syndicated feed, agencies. Mid-day accepts no responsibility or liability for its dependability, trustworthiness, reliability and data of the text. Mid-day management/mid-day.com reserves the sole right to alter, delete or remove (without notice) the content in its absolute discretion for any reason whatsoever