Mumbai-Pune Expressway vehicle pileup injures three

28 June,2017 11:34 AM IST |  Pune  |  Chaitraly Deshmukh

A container truck dashed into a car ahead of it and those cars dashed into two other cars ahead of them on the Mumbai-Pune Expressway on Tuesday in a vehicle pileup, which led to three sustaining injuries



The accident spot was cordoned off post the mishap

Three people sustained injuries on the Mumbai-Pune Expressway on Tuesday in a vehicle pileup.

A container truck dashed into a car ahead of it and those cars dashed into two other cars ahead of them. The injured have been admitted to a hospital.

Also read: MLC writes to Maharashtra CM over spurt in accidents on Mumbai-Pune Expressway

The Expressway control room said, "The accident took place between 3.45 pm and 4.20 pm near Palud village on the Pune lane towards Mumbai.

The brakes of a container plying heavy goods failed, due to which the driver lost control and rammed into another car. That car collided with two other cars."

Also read: 30 injured as driver loses control, bus turns turtle on Mumbai-Pune expressway

No major incident
"The accident spot was cordoned off and the vehicles were taken to the side with the help of cranes. There was no major incident; the three injured were rushed to the hospital and given preliminary treatment," the control room added.

Also read: 30 injured as driver loses control, bus turns turtle on Mumbai-Pune expressway

Meanwhile, authorities carrying out the repair work on the Expressway said they were halting vehicles for 5-10 minutes to clear any dangerous stone on the roads. This is routine monsoon work and no stretch has been blocked for it.

Safety work on
At present, work on the removal of some of dangerous stones in the hills near Pune, especially near the Khopoli exit lane is in progress.

Also read: In town for sister's wedding, NRI dies in Mumbai-Pune Expressway accident

After this, checking of loose stones on the Adoshi tunnel, Amrutanjan bridge and Khandala tunnel will be carried out.

The Maharashtra State Road Development Corporation and infrastructure company IRB have begun removing and checking loose bolts or stones in the ghat section between Khalapur and Khandala.

"Exciting news! Mid-day is now on WhatsApp Channels Subscribe today by clicking the link and stay updated with the latest news!" Click here!
Related Stories