Mumbai Metro trial run successful

01 May,2013 03:00 PM IST |   |  Agencies

The trial run of the Mumbai Metro train today, flagged off by Maharashtra Chief Minister Prithviraj Chavan, was successful.


On the occasion of Maharashtra Day today, Mumbaikars were treated to a successful trial run of the state's first Metro railway.

Chief Minister Prithviraj Chavan flagged off the three-km long trial run of the Mumbai Metro between Versova and Azad Nagar in Andheri.


Maharashtra CM Prithviraj Chavan flagging of the Mumbai Metro (Pic - Nimesh Dave)

The section is a part of the 11.40 km Versova-Ghatkopar corridor which will provide a vital east-west link and drastically reduce travel time from the existing 90 minutes to barely 20 minutes.

Chavan said that the Versova-Ghatkopar line will become operational by December.

He said the Metro would be extended to the adjacent Thane district and that work on a separate monorail project has been expedited.


Mumbai Metro on its three-km long trial run (Pic - Nimesh Dave)

The Mumbai Metro's Versova-Ghatkopar first phase is being constructed at a cost of around Rs 2,356 crore by a Reliance Infrastructure-led consortium on behalf of Mumbai Metropolitan Region Development Authority (MMRDA).

The Metro sector is an elevated corridor supported by columns at the road median and will enable connectivity of eastern-western suburbs to the Western Railway and Central Railway.

The MMRDA plans to provide an interchange facility within the two railway networks at Ghatkopar and Andheri.u00a0

"Exciting news! Mid-day is now on WhatsApp Channels Subscribe today by clicking the link and stay updated with the latest news!" Click here!
Related Stories