13 July,2023 07:11 AM IST | Mumbai | Ranjeet Jadhav
Potholes on the recently inaugurated Kopri rail overbridge on Monday. Pics/Sameer Markande
Days after mid-day highlighted the presence of potholes on the Kopri rail overbridge (ROB), the craters have been filled. Central Railway (CR) has claimed that the overall structure poses no threat to commuters.
A CR official said, "The potholes and uneven surface of the cement concrete stretch on the Kopri ROB were attended to at night. Spots [potholes and cracks] were noticed on the top wearing coat [protective layer] and not in the main structural concrete. Heavy vehicles were plying at full speed during the first phase of the work. During the setting of concrete, the bond between the reinforcement and concrete may have been disturbed at isolated locations on account of vibrations. The overall structure is absolutely safe."
On July 12, mid-day reported about how the sorry state of Kopri bridge - which this newspaper had highlighted the day before - had sparked a war of words. Shiv Sena (UBT) leader and former minister Aaditya Thackeray lashed out at Chief Minister Eknath Shinde, reminding citizens that the ROB had been inaugurated by the latter on his birthday, February 9, this year.
ALSO READ
Thane: Begging bowls out, potholes filled in Diva
BMC appoints IIT Bombay to oversee quality of 701-km concrete roads
Mumbai: Return of rain brings with it more potholes
Mumbai: Rs 553 cr Naigaon-Virar fully concreted stretch develops potholes
Mumbai potholes, roads to be fixed before Ganesh Chaturthi: BMC
According to the Mumbai Metropolitan Region Development Authority, the cement concrete stretch was built by CR. On Tuesday, a CR official told mid-day, "Fixing the ROB is the Railways' responsibility. These potholes will be attended to in the next two to three days." When mid-day photographer Sameer Markande visited the spot on Wednesday, he noticed that the smoothness of the stretch had been restored.