01 October,2022 09:45 PM IST | Mumbai | Asif Rizvi
Representative image. Pic/Istock
The Mumbai Traffic Police on Saturday issued a list of traffic diversions and alternate routes for the ongoing Mumbai Metro 2B work in the eastern suburbs of the city.
In a notification, the police said, in Chunabhatti Traffic Division, the Metro 2B project is underway and pillars will be erected on S.G. Barve Road. For the construction work, it is necessary to temporarily close the road from Shiv Shrushti Nalla to Nehru Nagar Junction (Kurla Signal) on S.G. Barve Marg and divert the traffic completely for four-wheelers, heavy vehicles and BEST buses.
Also Read: Mumbai cops take custody of Chhota Shakeel kin Salim Fruit held in NIA case
The order was issued by Vinavak Dhakne, Deputy Commissioner of Police (Eastern Suburbs) Traffic, Mumbai which said, the diversions will remain in place till December 31, 2022.
ALSO READ
BEST wet lease bus staff go on flash strike in Mumbai; services partially hit
Mumbai: Biker’s neck slashed after getting entangled in kite manja
US based Thane man duped of Rs 1 lakh by people posing as gas firm staff
Mumbai: BEST bus services affected as workers go on flash strike; watch video
Mumbai: Dust suction vans to be introduced across wards
It said, In order to prevent danger, obstruction and inconvenience to the public following diversions and road closures were being made.
Roads temporarily closed for four-wheelers and heavy vehicles:
One Way road-
Alternate routes: