29 July,2024 10:30 PM IST | Mumbai | Rajendra B. Aklekar
Sion ROB. File Pic/Satej Shinde
The Central Railway on Monday announced that the Sion Road Over Bridge (ROB) will be closed for vehicular traffic with effect from 01.08.2024 (mid-night of 31.07.2024) to facilitate dismantling and reconstruction work.
"Central Railway in co-ordination with the Municipal Corporation of Greater Mumbai (MCGM) will construct New Road Over Bridge (ROB) in place of the existing ROB near Sion railway station at kms 12/10-11," a spokesperson said.
"The Indian Institute of Technology (IIT), Mumbai, in their structural audit report had recommended dismantling of the existing ROB and re-construction of a new ROB with steel Girders and RCC slab. Besides the existing Sion ROB is also infringing on the proposed alignment of 5th and 6th line between CSMT -Kurla," he said.
"Central Railway requests the support of the public in carrying out this important work and regrets the inconvenience caused," he added.
ALSO READ
Sharad Pawar flags off 'Family Run 3.0' marathon in Pune
AP Dhillon tells Diljit Dosanjh to unblock him on Instagram, singer reacts
Thane company owner booked for employing minors in illegal labour practice
Christmas Eve 2024: It’s the most wonderful time of the year in Bandra
Christmas 2024: A Bambaiyya story
During the reconstruction work public can use alternate public Foot Over Bridges (FOB) located on either side of the existing Sion ROB which are as follows:
⢠Public FOB (Dharavi Dhobighat FOB) at about 500 mtrs towards Sion hospital side,
⢠Public FOB at about 350 mtrs Kurla end of Sion station
"Road users are requested to follow the traffic regulation guidelines issued by the Traffic Department," an official said.