26 April,2023 03:52 PM IST | Mumbai | mid-day online correspondent
Pic/Western Railway
The Western Railway on Wednesday said that the punctuality of trains between Borivali and Virar in stations Mumbai will be enhanced after the Western Railway was successful in carrying out the work of removal of operational constraints at Borivali station.
In a statement, the Western Railway said that with the aim of improving mobility as well as enhancing safety and speed, Western Railway has carried out the work of removing operational constraints related to track and points at Borivali (north).
According to a press release issued by Sumit Thakur - Chief Public Relations Officer of Western Railway, with the successful completion of this major infrastructural enhancement, the punctuality of trains between Borivali and Virar will be enhanced. While carrying out this work, Point Nos. 173 and 174 at Borivali (north) were converted to Thick Web Switches (TWS).
Also Read: Mumbai-Ahmedabad High Speed Rail corridor completes 50 km of viaduct work
ALSO READ
Vasai terror: Stray dog bites 35 in two hours
Born in Yavatmal sanctuary, tiger travels 500 km to Solapur district
APAAR ID: Parents’ bodies raise concerns about potential misuse of data
Freshers get preference over seniors
OBC leaders shocked by my exclusion from Maharashtra cabinet: Chhagan Bhujbal
It said, Point No. 173 was shifted by 2.8m and all free joints were welded. With the completion of this work, trains can move at 30 kmph at this crossover, leading to better mobility. Trains can now be diverted from Platform No. 8 to DOWN Fast line towards Virar side and can also be received on Platform No. 8 from UP Fast line at Borivali station.
It further said that the route between Borivali and Dahisar stations will now be cleared faster, ensuring smooth train operation over the section.