14 February,2023 07:13 PM IST | Mumbai | mid-day online correspondent
Representational Pic
The Central Railway (CR) on Tuesday said that it will operate traffic blocks for maintenance work on Bhivpuri Road-Karjat down line.
In a statement, the CR said that its Mumbai Division will operate a special traffic block for working of BCM in the down line between Bhivpuri and Karjat stations on February 14/15 to February 18/19. The blocks will be operated during midnight from 01.50 am to 04.50 am (3 hours).
The details of the train running pattern are as under:
Running pattern of suburban trains on all 5 days-
ALSO READ
Maharashtra Governor, CM mourn demise of Shyam Benegal, pay rich tributes to him
MMRDA accelerates infra push, secures crucial approvals for projects in Mumbai
Maharashtra excise dept employee kills self due to harassment by money lenders; three booked
Now you can travel from Mumbai's eastern suburbs to BKC in just 15 minutes
Vijay Hazare Trophy: Gaikwad guides Maharashtra to 9-wkt win; Kishan, Utkarsh impress for Jharkhand
- Local leaving from CSMT for Karjat at 00.24 hrs will be short terminated at Badlapur
- Local leaving from Karjat for CSMT at 02.33 hrs will run from Badlapur
The CR said, "passengers are requested to bear with the railway administration for the inconvenience caused due to these infrastructure blocks."
Also Read: Mumbai Police raids shops in Juhu, e-cigarettes worth lakhs seized; two held
CR's Mumbai division had earlier operated a mega block on its suburban sections for carrying out various engineering and maintenance works on February 5.
In a statement, the CR had said that the mega block was operated on the Matunga-Mulund up and down fast lines from 11.05 am to 3.55 pm on February 5.
It had said that the down fast line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.35 pm was diverted on down slow line between Matunga and Mulund stations halting as per their respective schedule. The fast trains beyond Thane were re-diverted on down fast lines at Mulund.
The CR had further said that the up fast line services leaving Thane from 10.50 am to 3.46 pm were diverted on up slow line between Mulund and Matunga halting as per their schedule halts and were re-diverted on up fast line at Matunga.