08 April,2023 09:04 AM IST | Mumbai | A Correspondent
The two studios that were demolished on Friday
The Brihanmumbai Municipal Corporation (BMC) on Friday demolished two film studios at Madh in Malad West, a day after getting a go-ahead from the NGT. Three others will be demolished within the next two days, said a civic official.
"The action was taken as the studios were built in violation of the guidelines of the Coastal Regulation Zone (CRZ). Also, in 2019, these studios received temporary permission to operate," a civic official said.
The studio owners were to demolish the structures upon the expiry of the permission in October 2022, according to the BMC's documents.
ALSO READ
Horoscope today, November 6: Check astrological predictions for all zodiac signs
Conducting free and fair elections is our duty: DGP Sanjay Verma
Maharashtra Assembly Elections 2024: FIR against Sanjay Raut's brother
2008 Malegaon Blast Case: NIA court issues warrant against Pragya Thakur
Sena (UBT) expels five functionaries for 'anti-party activities' ahead of polls
The Maharashtra Coastal Zone Management Authority (MCZMA) issued notice to the illegal studios on September 12, 2022, following which the owners approached the National Green Tribunal (NGT). However, the NGT on March 6 dismissed their plea and ordered the BMC to take action on the studios.
Also read: Mumbai: âTeachers booked for assault not yet arrested'
There are 22 studios at Madh, of which two have the permission of the Building Proposal department of the BMC. While two studios were demolished by the BMC previously, two others were demolished by their owners.
The BMC reportedly received 49 complaints about illegal studios between 2021 and 2022.
BMC administrator Iqbal Singh Chahal then ordered an enquiry into civic officials' alleged role and the probe panel found 13 of them guilty. Six civic officials were from the Building Factory department and seven from the Assessment and Collection department. Chahal has the order to decide the quantum of punishment.