04 December,2019 07:20 AM IST | Mumbai | A correspondent
BMC has so far fixed footpaths on Kakasaheb Gadgil road, Baburao Perulkar Road, JK Sawant Road, SK Bole Road, Ranade Road, NC Kelkar Road. File pic
After the G north ward office assistant municipal commissioner, Kiran Dighavkar came up with an initiative on November 8 to collaborate with the citizens over maintaining of footpaths, the ward office has repaired footpaths at 85-odd locations. Further, the ward office is aiming to repair 1lakh sq meters of footpaths in Dadar.
The area which is popular as a shopping hub and has plenty of street hawkers surrounding the station area alone, the BMC wants to make the footpaths pedestrian-friendly.
On November 8, the G North ward first started a social media group with the residents of area around Shivaji Park where about 156 members joined. The residents also updated photographs of bad patches and broken footpaths and roads from the surrounding area which the officials promised of fixing in 24-48 hours. After 25 days of the initiative put forward, complaints at about 85 locations were attended and various other footpaths were repaired. Dighavkar also tweeted that there will be 1 lakh square meters of the footpath of Dadar area which will be repaired and made pedestrian-friendly.
BMC has so far fixed footpaths on Kakasaheb Gadgil road, Baburao Perulkar Road, JK Sawant Road, SK Bole Road, Ranade Road, NC Kelkar Road, and Gokhale Road. It has fixed bad patches on D'Silva Road, Senapati Bapat Road, SVS Road, around Shivaji Park precinct, DL Vaidya road, Ranade Raid, NC Kelkar Road and Gokhale Road.
ALSO READ
Maharashtra knows what Raj Thackeray is and isn't, says Ashish Shelar
47,392 centenarians among 9.7 crore voters; 22.22 lakh in 18-19 age group
Ajit Pawar responds to the BJP's calls to remove Nawab Malik ahead of polls
Nominations of 7,994 candidates across 288 assembly seats found valid
Anil Deshmukh's son to square off father's namesake fielded by Ajit Pawar
"We aimed at attending the complaints within 24 to a maximum of 48 hours where spot repairs were done. We dedicated two teams of junior engineers and supervisors along with labourers who were solving the problems wherever reported. Currently, our focus is on repairing 1lakh sq meters of footpath in Dadar. There were various complaints coming in from Shivaji Park residents as well and we want to fix everything on war-footing."
Catch up on all the latest Mumbai news, crime news, current affairs, and also a complete guide on Mumbai from food to things to do and events across the city here. Also download the new mid-day Android and iOS apps to get latest updates